A serious control incident by E-Redes has cleared out a Leiria-based window outline production line with €450,000 in harms, after the utility company mistakenly infused 380 volts into its frameworks rather than the standard 220 volts.
The surge wiped out the factory’s entire electrical organize and IT infrastructure, stopping operations and causing critical budgetary misfortunes. While E-Redes has recognized obligation, the company is pushing the recompense handle to its protections supplier, clearing out the influenced trade tangled in claims and delays.
Forced to reject numerous client orders due to the disturbance, the manufacturing plant presently faces not fair repair costs, but reputational and operational difficulties — with no clear timeline for compensation.